Question
Floyds Fabrication has just received an order from Gimbal Plumbing Fixtures for 100,000 specially designed three-inch-diameter casings to be delivered in one week. The contract
Floyd’s Fabrication has just received an order from Gimbal Plumbing Fixtures for 100,000 specially designed three-inch-diameter casings to be delivered in one week. The contract price was negotiated upfront; hence, Floyd’s maximum profit will be obtained when its costs are minimized. Floyd’s has three production facilities capable of producing the casings. Production costs do not vary between locations, but the changeover (setup) costs do vary, as does the cost of transporting the finished items to Gimbal. The following table details these costs.
Formulate and solve this problem as a mixed-integer linear programming model.
Maximum Transportation Cost Changcover Cost Weekly Production Location (per 1000) Springfield Oak Ridge $1200 $224 65,000 SI100 $280 50,000 Westchester S1000 S245 55,000
Step by Step Solution
3.41 Rating (148 Votes )
There are 3 Steps involved in it
Step: 1
Data Location Changeover Cost Transportation Cost per 1000 Maximum weekly production Spr...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started