Nova Companys total overhead costs at various levels of activity follow: Month Machine-Hours Total Overhead Costs April 75,000 $ 208,000 May 109,500 280,000 June 90,000
Nova Company’s total overhead costs at various levels of activity follow:
Month | Machine-Hours | Total Overhead Costs | ||
April | 75,000 | $ | 208,000 | |
May | 109,500 | 280,000 | ||
June | 90,000 | 232,000 | ||
July | 100,000 | 247,000 | ||
Assume that the total overhead costs consist of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 75,000 machine-hour level of activity is as follows:
Utilities (V) | $ | 49,000 | |
Supervisory salaries (F) | 22,000 | ||
Maintenance (M) | 137,000 | ||
Total overhead costs | $ | 208,000 | |
V = variable; F = fixed; M = mixed.
Nova Company’s management wants to break the maintenance cost down into its basic variable and fixed cost elements.
Required:
1. As shown, overhead costs in May amounted to $280,000. Determine how much of this consisted of maintenance cost. (Hint: To do this, it may be helpful to first determine how much of the $280,000 consisted of utilities and supervisory salaries. Think about the behaviour of variable and fixed costs!) (Do not round intermediate calculations. Round your answers to the nearest whole dollar amount.)
2. By means of the high–low method, estimate a cost formula for maintenance. (Do not round intermediate calculations. Round "Fixed cost" answer to the nearest whole dollar and "Variable cost" answer to 2 decimal places.)
Y= a + b X
3. Express the company’s total overhead costs in the linear equation form Y = a + bX. (Do not round intermediate calculations. Round "Fixed cost" answer to the nearest whole dollar and "Variable cost" answer to 2 decimal places.)
Y= a + bX
4. What total overhead costs would you expect to be incurred at an operating activity level of 70,000 machine-hours? At an operating activity level of 85,000 machine-hours? (Do not round intermediate calculations. Round your answers to the nearest whole dollar amount.)
70000 hrs=
85000 hrs=
Step by Step Solution
3.38 Rating (151 Votes )
There are 3 Steps involved in it
Step: 1
Nova Company 1 As shown overhead costs in May amounted to 280000 Determine how much of this consiste...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started