Answered step by step
Verified Expert Solution
Question
1 Approved Answer
For its inspecting cost pool, Waterway, Inc. estimated overhead cost of $400000 and 4000 inspections. The actual overhead cost for that cost pool was $440000
For its inspecting cost pool, Waterway, Inc. estimated overhead cost of $400000 and 4000 inspections. The actual overhead cost for that cost pool was $440000 for 5000 inspections. The activity-based overhead rate used to assign the costs of the inspecting cost pool to products is $110 per inspection. $88 per inspection. $100 per inspection. $80 per inspection. One of Waterway Company's activity cost pools is inspection which has estimated overhead costs of $210000. Waterway produces throw rugs (700 inspections) and area rugs (1300 inspections). what amount of the inspecting activity cost pool should be assigned to throw rugs? $210000. O $105000. $113077. O $73500
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started