For the following potential available energy: A) Estimate the optimum power plant capacity, and its plant factor, for maximum utilization of the following available

image

For the following potential available energy: A) Estimate the optimum power plant capacity, and its plant factor, for maximum utilization of the following available potential. B) For a power plant with N number of identical units, each at "P" MW capacity, what would be the actual minimum number of N and at what "P", to absorb all the available potential. C) For capacity calculated in (B), what would be Plant Factor. Available potential in GWh / month : (one month=30 days) 12.4, 11.3, 10.5, 8.8, 6.1, 4.7, 3.2, 1.8, 1.5, 1.01, 0.71, 9.5 Assumptions for part (A) calculation: - Base load operated power plant. Power plant is equipped with 3 identical units. - Maximum and minimum allowable operating range of 115% and 30% of design power for each unit. - Use steps of 1MW, in capacity evaluation (of each units), for power plant capacity calculation in (A) Assumption for part (B) calculation: - Base load operated power plant - Maximum and minimum allowable operating range of 115% and 30% of design power for each unit

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Total Quality Management

Authors: Poornima M. Charantimath

3rd Edition

9332579393, 978-9332579392

More Books

Students also viewed these Mechanical Engineering questions

Question

Define reliability engineering.

Answered: 1 week ago

Question

Distinguish corrective action vs. preventive action.

Answered: 1 week ago

Question

Discuss the steps for establishing the quality circle.

Answered: 1 week ago