Answered step by step
Verified Expert Solution
Question
1 Approved Answer
For the following problem determine: 1. Total usage per piece 2. Pieces per bar 3. Area of the bar stock 4. Volume of a
For the following problem determine: 1. Total usage per piece 2. Pieces per bar 3. Area of the bar stock 4. Volume of a good piece 5. Weight of a good piece 6. Cost of a good piece 7. Cost of # of good pieces in a bar 8. Cost of a bar 9. Cost of waste 10. Yield A round shaft 6.5 in. OD has a specified length of 31.675 in. The facing dimension necessary for a smooth end finish is 1/16 in. The width of the lathe cutoff tool is 3/16 in. The length of the raw bar stock is 12 ft. The lathe collet requires a minimum of 4 in. for gripping the last part. The material costs $0.95/lb and has a density of .291b/in. Use excel and put the formulas in the cells.
Step by Step Solution
★★★★★
3.48 Rating (164 Votes )
There are 3 Steps involved in it
Step: 1
1 Total usage per piece The length of the raw bar stock is 12 ft which is equal to 144 inches The lathe collets require a minimum of 4 inches for grip...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started