Question

1 Approved Answer

Estimate the total time and cost, and the cost per cubic yard, bank measure, for the second balance point, Sections IV and V, of the

Estimate the total time and cost, and the cost per cubic yard, bank measure, for the second balance point, Sections IV and V, of the mass diagram in Figure 7.9. 

A self-loading scraper with a 15-cy, loose measure, capacity will be used for the  excavating and hauling. Assume an average haul speed of 12 mi/hr and return  speed of 20 mi/hr. Use a 3-min load time and 2-min dump time. Assume a  45-min effective hour and a swell factor of 8%. The hourly cost of the scraper,  with operator, is $110.00/hr.
 

Existing grade Final grade 800 600 Haul dist = 2000 Cut cy 400 -- || - Average haul distance = 3400 200 Average haul distance = 4300 50 60 70 80 III -- 10 IV --Haul distance = 3000 20 30 40 90 -200 yHaul distance = 2000 Fill cy -400 Balance point Balance point -600 Stations (in 100 ft) -800 FIGURE 7.9 I Profile and mass diagram for highway project.

Step by Step Solution

3.54 Rating (164 Votes )

There are 3 Steps involved in it

Step: 1

Step 1 of 13 A Calculate the quantity of haul per trip in bank measure Busing the relation B 10... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Management in the Supply Chain Decisions and Cases

Authors: Roger Schroeder, M. Johnny Rungtusanatham, Susan Goldstein

6th edition

73525243, 978-0073525242

More Books

Students also viewed these Accounting questions

Question

What opportunities exist for raises and advancement?

Answered: 1 week ago