Question
Foundational [LO3-1, LO3-2, LO3-3, LO3-4] Greenwood Company manufactures two products14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide
Foundational [LO3-1, LO3-2, LO3-3, LO3-4]
Greenwood Company manufactures two products14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:
Activity Cost PoolActivity MeasureEstimated Overhead CostExpected ActivityMachiningMachine-hours$200,00010,000MHsMachine setupsNumber of setups$100,000200setupsProduction designNumber of products$84,0002productsGeneral factoryDirect labor-hours$300,00012,000DLHs
Activity MeasureProduct YProduct ZMachining8,0002,000Number of setups40160Number of products11Direct labor-hours9,0003,000
References
Section BreakFoundational [LO3-1, LO3-2, LO3-3, LO3-4]
1.
Award:1 out of 1.00 point
Foundational 3-1
Required:1.What is the company's plantwide overhead rate?
References
WorksheetFoundational 3-1
2.
Award:0 out of 1.00 point
Foundational 3-2
2.Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z?
References
WorksheetFoundational 3-2
3.
Award:1 out of 1.00 point
Foundational 3-3
3.What is the activity rate for the Machining activity cost pool?
References
WorksheetFoundational 3-3
4.
Award:1 out of 1.00 point
Foundational 3-4
4.What is the activity rate for the Machine Setups activity cost pool?
References
WorksheetFoundational 3-4
5.
Award:1 out of 1.00 point
Foundational 3-5
5.What is the activity rate for the Product Design activity cost pool?
References
WorksheetFoundational 3-5
6.
Award:1 out of 1.00 point
Foundational 3-6
6.What is the activity rate for the General Factory activity cost pool?
References
WorksheetFoundational 3-6
7.
Award:1 out of 1.00 point
Foundational 3-7
7.Which of the four activities is a batch-level activity?Machine setups activityReferences
WorksheetFoundational 3-7
8.
Award:1 out of 1.00 point
Foundational 3-8
8.Which of the four activities is a product-level activity?Product design activityReferences
WorksheetFoundational 3-8
9.
Award:0 out of 1.00 point
Foundational 3-9
9.Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
References
WorksheetFoundational 3-9
10.
Award:0 out of 1.00 point
Foundational 3-10
10.Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
References
WorksheetFoundational 3-10
11.
Award:0 out of 1.00 point
Foundational 3-11
11.Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z?
References
WorksheetFoundational 3-11
12.
Award:0 out of 1.00 point
Foundational 3-12
12.Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z?
References
WorksheetFoundational 3-12
13.
Award:0 out of 1.00 point
Foundational 3-13
13.Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z?
References
WorksheetFoundational 3-13
14.
Award:1 out of 1.00 point
Foundational 3-14
14.Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z?
References
WorksheetFoundational 3-14
15.
Award:0 out of 1.00 point
Foundational 3-15
15.Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z?
References
WorksheetFoundational 3-15
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started