Four jobs must be processed on a single machine. The time required to perform each job, the due date, and the penalty ( in dollars
Four jobs must be processed on a single machine. The time required to perform each
job, the due date, and the penalty in dollars per day the job is late are given in below
table:
a Design a branchandbound algorithm for this single machine problem specifying
how the branch, bound, and fathoming steps would be performed.
b Use this algorithm to solve this problem.