Question
FutureWays Manufacturing has the following direct material list: Motor, 1 per unit: $84.79 Casing, 1 per unit: $34.95 Miscellaneous nuts and bolts: $0.52 per unit
FutureWays Manufacturing has the following direct material list:
Motor, 1 per unit: $84.79
Casing, 1 per unit: $34.95
Miscellaneous nuts and bolts: $0.52 per unit
Quantity discount on motors: $1.10 per unit
Freight: $4.25 unit
Labor is provided primarily by robots. Direct labor is .25 hours per unit, mainly for supervision of the robots. Machine downtime is .05 hours per unit. The standard direct labor rate is $25 per hour.
Each unit requires 15 hours of machine time.
Total overhead for the year is $752,000 and is based on machine hours, which are expected to be 800,000 hours for the year. Variable overhead is expected to be $601,000. What is the standard direct material cost?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started