-Garret Corporation uses a predetermined overhead rate calculated per direct labor hour. This plantwide predetermined rate was based on a cost formula that estimated 26297
-Garret Corporation uses a predetermined overhead rate calculated per direct labor hour. This plantwide predetermined rate was based on a cost formula that estimated 26297 of total manufacturing overhead for an estimated activity level of 3562 direct labor-hours. Calculate total costs for the Job 2013 that requires 15 direct labor-hours. Hourly wage rate is $2,3. Direct materials used for the Job 2013 is $37