Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Gaspe Mining Corp. bought mineral-bearing land for $450,000. Engineers and geologists estimate that the site will yield 512,000 kilograms of economically removable ore. The
Gaspe Mining Corp. bought mineral-bearing land for $450,000. Engineers and geologists estimate that the site will yield 512,000 kilograms of economically removable ore. The land will have a net recoverable value of $102,400 after the ore is removed; this is the combination of site restoration costs and the resale value of the property. To work the property, Gaspe built structures and sheds on the site that cost $272,000; these will last 10 years. Machinery that cost $244,800 was installed at the mine, and the added cost for installation was $5,800. This machinery should last 15 years; like that of the structures, the usefulness of the machinery is confined to these mining operations. For both structures and machinery, dismantling and removal costs when the property has been fully worked will approximately equal the value of the machinery at that time; therefore. Gaspe does not plan to use the structures or the machinery after the minerals have been removed. In the first year, Gaspe removed only 23,200 kilograms of ore; however, production was doubled in the second year. It is expected that all of the removable ore will be extracted within eight years from the start of operations.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started