Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows: Cost

Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows:

Cost Category Standard Cost per 100 Two-Liter Bottles
Direct labor $4.00
Direct materials 9.10
Factory overhead 0.55
Total $13.65

At the beginning of July, GBC management planned to produce 380,000 bottles. The actual number of bottles produced for July was 385,000 bottles. The actual costs for July of the current year were as follows:

Cost Category Actual Cost for the Month Ended July 31
Direct labor $14,860
Direct materials 33,824
Factory overhead 2,582
Total $51,266
Required:
A. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production.
B. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
C. Interpret the budget performance report.

Genie in a Bottle Company

Manufacturing Cost Budget

For the Month Ended July 31, 2016

1

Manufacturing Costs

Standard Cost at Planned Volume (380,000 Bottles)

2

Direct labor

3

Direct materials

4

Factory overhead

5

Total

Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Genie in a Bottle Company

Budget Performance Report

For the Month Ended July 31, 2016

1

Manufacturing Costs

Actual Costs

Standard Cost at Actual Volume (385,000 Bottles)

Cost Variance(Favorable) Unfavorable

2

Direct labor

3

Direct materials

4

Factory overhead

5

Total manufacturing costs

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Assurance And Auditing

Authors: Thomas Nelson

1st Edition

0170111342, 978-0170111348

More Books

Students also viewed these Accounting questions

Question

Describe a persuasive message.

Answered: 1 week ago

Question

Identify and use the five steps for conducting research.

Answered: 1 week ago

Question

List the goals of a persuasive message.

Answered: 1 week ago