Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows: Cost
Genie in a Bottle Company (GBC) manufactures plastic two-liter bottles for the beverage industry. The cost standards per 100 two-liter bottles are as follows:
Cost Category | Standard Cost per 100 Two-Liter Bottles |
Direct labor | $3.00 |
Direct materials | 9.20 |
Factory overhead | 0.70 |
Total | $12.90 |
At the beginning of July, GBC management planned to produce 385,000 bottles. The actual number of bottles produced for July was 389,000 bottles. The actual costs for July of the current year were as follows:
Cost Category | Actual Cost for the Month Ended July 31 |
Direct labor | $11,100 |
Direct materials | 34,592 |
Factory overhead | 3,192 |
Total | $48,884 |
Required: | |
A. | Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production. |
B. | Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. |
C. | Interpret the budget performance report. |
A. Prepare the July manufacturing standard cost budget (direct labor, direct materials, and factory overhead) for GBC, assuming planned production.
Genie in a Bottle Company |
Manufacturing Cost Budget |
For the Month Ended July 31 |
1 | Manufacturing Costs | Standard Cost at Planned Volume (385,000 Bottles) |
2 | Direct labor |
|
3 | Direct materials |
|
4 | Factory overhead |
|
5 | Total |
|
B. Prepare a budget performance report for manufacturing costs, showing the total cost variances for direct materials, direct labor, and factory overhead for July. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Genie in a Bottle Company |
Budget Performance Report |
For the Month Ended July 31 |
1 | Manufacturing Costs | Actual Costs | Standard Cost at Actual Volume (389,000 Bottles) | Cost Variance(Favorable) Unfavorable |
2 | Direct labor |
|
|
|
3 | Direct materials |
|
|
|
4 | Factory overhead |
|
|
|
5 | Total manufacturing costs |
|
|
|
C. Interpret the budget performance report.
The Company's actual costs were $1,297 budgeted. direct labor and direct material cost variances more than offset a small factory overhead cost variance.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started