GeoTrack scooter needs, on average, 3,000 tons of aluminum each week, with a standard deviation of 1200 tons. The lead time to receive its orders
GeoTrack scooter needs, on average, 3,000 tons of aluminum each week, with a standard deviation of 1200 tons. The lead time to receive its orders is 10 weeks. The holding cost for one ton of aluminum for one week is $12. It operates with a 0.99 in-stock probability. Use Table 11.5. If its average inventory was 14,500 tons, what would be its average holding cost per week? A. $145,000 B. $174,000 C. $134,700 D. $125,800