Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Given: Depth Hole size Full hole drill pipe Heavy wall full hole drill pipe Drill collar Viscosimeter reading @ 300 RPM Viscosimeter reading @ 600

image text in transcribed

Given: Depth Hole size Full hole drill pipe Heavy wall full hole drill pipe Drill collar Viscosimeter reading @ 300 RPM Viscosimeter reading @ 600 RPM Bit nozzle size = 10,000 ft = 9.625 inches = 5x4.276", 19.5 lb/ft, X95, 2 = 5x3", 750 ft = 6.25"x 2.8125", 450 ft = 40 Bit nozzle velocity Bit nozzle constant Pump volumetric efficiency Pump mechanical efficiency = 65 = 13/32 inches = 330 ft/second = 0.93 = 0.91 = 0.86 From the given data, if the 180 psi overbalanced drilling operation uses type 4 surface equipment and 3 cones rock bit will be run at 400 gpm circulation rate, determine the practical pressure losses during the drilling operation with the assumption that the drilling mud as the Bingham Plastic fluid. (35 Marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Engineering Heat Transfer

Authors: G. F. Nellis, S. A. Klein

1st Edition

110717953X, 9781107179530

More Books

Students also viewed these Chemical Engineering questions

Question

3. What might be the response of the attorneys to this change?

Answered: 1 week ago