Given the following $3,000,000 Architectural/Engineering (A/E) design and construction management project for a new high school building (containing 2 floors and approximately 260,000 square feet)
Given the following $3,000,000 Architectural/Engineering (A/E) design and construction management project for a new high school building (containing 2 floors and approximately 260,000 square feet) word the WBS Dictionary and Introduction. (See attached screenshots for reference to help answer the question).
- The upcoming A/E design and construction management project has the following project management areas:
- Schematic Design
- Design Development
- Construction Documentation
- Bidding Phase Services
- Construction Administration Phase
- Project Closeout
- Project Management
INTRODUCTION The Work Breakdown Structure presented here represents all the work required, AND ONLY THE WORK REQUIRED, to complete this project.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
I cant see any attached screenshots for reference However I can guide you through creating a Work Breakdown Structure WBS Dictionary and Introduction ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started