Given the following jobs to be done next week at Sveris Workstation: Sven runs 2 machines simultaneously with a ( 65 % ) utilization and
Given the following jobs to be done next week at Sveris Workstation: Sven runs 2 machines simultaneously with a \( 65 \% \) utilization and \( 95 \% \) efficiency. What is the Load \( \% \) for next w