Given the problem below, id the attached solution for an SFC diagram correct? Consider control of the mixing process of two liquids ( A and

Given the problem below, id the attached solution for an SFC diagram correct?
Consider control of the mixing process of two liquids ( A and B) shown in the scheme below.
At first, on activating a hand switch (HS4, not shown in the diagram), liquid A should be introduced (VN1).
When the level reaches level LT2, flow B is started (VN2). At the same time, motor (MN5) is started.
When the level reaches LT3, flow A and flow B are stopped. 20 min after that, the motor is stopped, the discharge valve (VN3) is opened and the pump (PN4) is started.
When the level reaches LT1, the discharge valve (VN3) is closed and the pump (PN4) is stopped. At the same time indicator lamp (LAMP, not shown in diagram) will be on for 20min indicating that the process is finished.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Chemical Engineering questions