Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data.

Rounded Edge Squared Edge Total
Direct materials $ 9,500 $ 21,800 $ 31,300
Direct labor 6,000 12,000 18,000
Overhead (300% of direct labor cost) 18,000 36,000 54,000
Total cost $ 33,500 $ 69,800 $ 103,300
Quantity produced 10,500 ft. 14,000 ft.
Average cost per ft. (rounded) $ 3.19 $ 4.99

Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information.

Overhead Cost Category (Activity Cost Pool) Cost
Supervision $ 2,160
Depreciation of machinery 28,840
Assembly line preparation 23,000
Total overhead $ 54,000

She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.)

Usage
Overhead Cost Category (Activity Cost Pool) Driver Rounded Edge Squared Edge Total
Supervision Direct labor cost ($) $ 6,000 $ 12,000 $ 18,000
Depreciation of machinery Machine hours 200 hours 600 hours 800 hours
Assembly line preparation Setups (number) 30 times 95 times 125 times

Required:

1. Assign these three overhead cost pools to each of the two products using ABC.
Activity Overhead Cost Activity Drivers Activity Rate
Supervision $2,160 $18,000 Direct labor cost 12.00 % of direct labor cost
Depreciation of machinery 28,840 800 Machine hours $36.05 Per machine hour
Assembly line preparation 23,000 125 Setups $184.00 Per setup
Rounded edge Activity rate Activity driver incurred Overhead assigned
Supervision need % need need
Depreciation of machinery need need need
Assembly line preparation need need need
Squared edge Activity rate Activity driver incurred Overhead assigned
Components
Supervision 12.00 % 0 need
Depreciation of machinery $36.05 0 need
Assembly line preparation $184.00 0 need
2. Determine average cost per foot for each of the two products using ABC.
Rounded edge Squared edge
need need
need need
need need
need need
need need

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Routledge Companion To Accounting And Risk

Authors: Margaret Woods

1st Edition

1138860123, 9781138860124

More Books

Students also viewed these Accounting questions