Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,700 6,000 18,000 $33,700 10,300 ft. $ 3.27 Squared Edge Total $21,600 $ 31,300 11,800 17,800 35,400 53,400 $68,800 $102,500 14,100 ft. $ 4.88 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $53,400 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information. Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Total overhead Cost $ 2,136 28,520 22,744 $53,400 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost ($) Machine hours Setups (number) Rounded Edge $6,000 400 hours 31 times Squared Edge $11,800 600 hours 93 times Total $17,800 1,000 hours 124 times Invvry v uw voru uvuvi v pivuuuww worry Overhead Cost Activity Drivers Activity Rate Activity Supervision Direct labor cost Machine hours Depreciation of machinery Assembly line preparation Setups Rounded edge Activity rate Activity driver incurred Overhead assigned Supervision Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver incurred Overhead assigned Components Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started