Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

image text in transcribed
image text in transcribed
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge Squared Edge Total $19,000 $ 43,200 $ 62,200 12,200 23,800 36,000 36,608 71,400 108,000 $67,800 $138,400 $206,20 10,500 ft. 14,100 ft. $ 6.46 $ 9.82 Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $108,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following Information. overhead Cost Category Activity cost Pool Cost Supervision $5,400 Depreciation of machinery 56,600 Assembly Line preparation 46,000 Total overhead $108,000 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Driver Rounded Edge Squared Edge Total Supervision Direct labor cost (5) $12,200 $23,800 $36,000 Depreciation of machinery Machine hours 500 hours 1.500 hours 2,000 hours Assembly Line preparation Setups (number) 40 times 210 times 250 times Required: Required: Activity Rate % 1. Assign these three overhead cost pools to each of the two products using ABC. Activity Overhead Cost Activity Drivers Supervision Direct labor cost Depreciation of machinery Machine hours Assembly line preparation Setups Rounded edge Activity rate Supervision % Depreciation of machinery Assembly line preparation Activity driver Incurred Overhead assigned O 0 Activity rate Activity driver Incurred Overhead assigned Squared edge Components Supervision Depreciation of machinery Assembly line preparation % 0 0 0 2. Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions