Question
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge Total Direct materials $ 9,600 $ 21,600 $ 31,200 Direct labor 6,100 11,900 18,000 Overhead (300% of direct labor cost) 18,300 35,700 54,000 Total cost $ 34,000 $ 69,200 $ 103,200 Quantity produced 10,700 ft. 14,100 ft. Average cost per ft. (rounded) $ 3.18 $ 4.91 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information. Overhead Cost Category (Activity Cost Pool) Cost Supervision $ 2,160 Depreciation of machinery 28,840 Assembly line preparation 23,000 Total overhead $ 54,000 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Driver Rounded Edge Squared Edge Total Supervision Direct labor cost ($) $ 6,100 $ 11,900 $ 18,000 Depreciation of machinery Machine hours 400 hours 700 hours 1,100 hours Assembly line preparation Setups (number) 30 times 95 times 125 times Required:
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started