Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Gray, an engineer for a manufacturer of die-cast parts, inadvertently used the weight of the parts rather that the labor cost in calculating the bid

Gray, an engineer for a manufacturer of die-cast parts, inadvertently used the weight of the parts rather that the labor cost in calculating the bid price. As a result, the price bid per part was about 25 percent above the cost of the raw die cast material rather than about 80% above the raw die-cast material cost (which would have resulted from proper bid calculation). The manufacturer to whom the bid was submitted immediately accepted. Gray's employer claims that he should be allowed to avoid the contract since an error was made in the calculations. Which of the following is incorrect? Select the best answer.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Trading Football On Sports Exchanges The Match Odds Market

Authors: Cambridge Memorabilia

1st Edition

979-8513993841

More Books

Students also viewed these Finance questions