Question
Gray, an engineer for a manufacturer of die-cast parts, inadvertently used the weight of the parts rather that the labor cost in calculating the bid
Gray, an engineer for a manufacturer of die-cast parts, inadvertently used the weight of the parts rather that the labor cost in calculating the bid price. As a result, the price bid per part was about 25 percent above the cost of the raw die cast material rather than about 80% above the raw die-cast material cost (which would have resulted from proper bid calculation). The manufacturer to whom the bid was submitted immediately accepted. Gray's employer claims that he should be allowed to avoid the contract since an error was made in the calculations. Which of the following is incorrect? Select the best answer.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started