Question
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3,700 bookshelf speakers and
Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 3,700 bookshelf speakers and 4,500 floor speakers over the next two months, with the following delivery schedule:
Model | Month 1 | Month 2 |
Bookshelf | 2,300 | 1,400 |
Floor | 1,700 | 2,800 |
Greenville estimates that the production time for each bookshelf model is 0.7 hour and the production time for each floor model is 1 hour. The raw material costs are $12 for each bookshelf model and $14 for each floor model. Labor costs are $24 per hour using regular production time and $35 using overtime. Greenville has up to 2,600 hours of regular production time available each month and up to 1,200 additional hours of overtime available each month. If production for either cabinet exceeds demand in month 1, the cabinets can be stored at a cost of $7 per cabinet. For each product, determine the number of units that should be manufactured each month on regular time and on overtime to minimize total production and storage costs. If required, round your answers to the nearest whole number.
Regular Time Manufacture | ||
Model | Month 1 | Month 2 |
Bookshelf | ||
Floor |
Overtime Manufacture | ||
Model | Month 1 | Month 2 |
Bookshelf | ||
Floor |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started