Hagar Industrial Systems Company (HISC) is trying to decide between two different conveyor belt systems. System A costs $236,000, has a four-year life, and requires
Hagar Industrial Systems Company (HISC) is trying to decide between two different conveyor belt systems. System A costs $236,000, has a four-year life, and requires $74,000 in pretax annual operating costs. System B costs $336,000, has a six-year life, and requires $68,000 in pretax annual operating costs. Both systems are to be depreciated straight-line to zero over their lives and will have zero salvage value. HISC always needs a conveyor belt system; when one wears out, it must be replaced. Assume the tax rate is 30 percent and the discount rate is 9 percent. |
What is the EAC for each project? (Do not round intermediate calculations and round your answers to 2 decimal places, e.g., 32.16. A negative answer should be indicated by a minus sign.) |
EAC | |
System A | $ |
System B | $ |
Which conveyor belt system should the firm choose? | ||||
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started