Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

hand draw a future state value map and make the process as efficient as possible. Customer requirments 4 5 0 0 pieces per month (

hand draw a future state value map and make the process as efficient as possible.
Customer requirments
4500 pieces per month (1440 of small tabels and 3060 of medium tables)
An order from retail stores includes 25 tables.
Several daily shipments per day by truck to Customers
.
PRODUCTIONS PROCESS-lTables are made of three parts round glass, aluminium disc hardware, and timber legs.
While the glass is cut into a round shape, the discs are cut from aluminium coils. The aluminium hardware is then glued into the glass. At the same time, legs are made from wood lumbers. The wood is cut into standard pieces and then shaped using a lathe. After sanding and coating, the legs are packaged together with the glass (and its aluminium hardware attached to it). Finally, the flat pack is briefly
inspected to ensure all the components have been included.
Tempered glass is supplied by CrystalCraft Glassworks every fortnight.
Aluminium coils are supplied by AluCoil Producers every fortnight.
Wood lumbers are supplied by ForestHarvest Wood on a weekly basis.
.
WORK TIME
20 days in a month.
One-shift operation in all production departments.
Eight (8) hours every shift.
Two 30-minute breaks during each shift (manual processes stop during breaks).
Planned maintenance occurs once a month during work time and takes 5 hours.
During maintenance, the production stops
.
PRODUCTION CONTROL DEPARTMENT
Receives 4 week forecast from retail shops.
Receives weekly orders from retail shops.
Issues weekly orders to suppliers.
Issues 2-week schedule to glass and aluminium hardware areas.
Issues weekly build schedules to departments dedicated to the production of timber legs
.
PROCESS INFORMATION
By walking around the factory, you are able to observe the following. Some of the processes are dedicated to the glass table product family, while others are dedicated to multiple product families.
Wood cutting
o Cycle time =5 seconds
o Changeover time =15 minutes
o 1 Operator
o Observed inventory:
1 weeks of timber wood lumbers
360 sets of cut legs for small tables
765 sets of cut legs for medium tables
.
Lathe
o Cycle time =95 seconds
o Changeover time =25 minutes
o 1 Operator
o Observed inventory:
144 sets of processed legs for small tables
306 sets of processed legs for medium tables
.
Sanding
o Cycle time =138 seconds
o Changeover time =0
o 1 Operator
o Observed inventory:
216 sets of sanded legs for small tables
459 sets of sanded legs for medium tables
.
Coating
o Cycle time =105 second
o Changeover time =0
o 1 Operator
o Observed inventory:
284 sets of coated legs for small tables
612 sets of coated legs for medium tables
.
Glass cutting
o Cycle time =10 seconds
o Changeover time =20 seconds
o 1 Operator
o Observed inventory:
1 week of uncut tempered glass
144 glass table tops for small tables
306 glass table tops for medium tables
.
Metal cutting
o Cycle time =5 seconds
o Changeover time =0
o 1 Operator
o Observed inventory:
1 week of aluminium coils
144 sets of metal hardware for small tables
306 sets of metal hardware for medium tables
.
Assembly (glass table top and aluminium hardware)
o Total work time per piece =225 seconds
o Changeover time =0
o 2 operators
o Observed inventory:
284 assembled glass table tops for small tables
612 assembled glass table tops for medium tables
.
Package
o Total work time per piece =342 seconds
o Changeover time =0
o 2 operators
o Observed inventory:
360 small table flat packs
765 medium tables flat packs
.
Inspection
o Cycle time =75 seconds
o Changeover time =0
o 1 Operator
o Observed inventory:
72 inspected small table flat packs
153 inspected medium table flat packs
Shipping department: removes parts from finished goods warehouse and stages
them for truck shipment to customer.
Note: Urban Haven Forniture is willing to dubplicate two resources sanding and
coating and assign them to the product families that use them

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Applied Wildlife Habitat Management

Authors: Roel R. Lopez, Michael L. Morrison, Israel D. Parker

1st Edition

9781623495022

More Books

Students also viewed these General Management questions

Question

Identify the motives that fuel prejudice.

Answered: 1 week ago