Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

help asap please Q1. (12 Marks) A load cell is installed as part of a crane-safe load monitoring system. Four active atrain gauges are included

help asap please
image text in transcribed
Q1. (12 Marks) A load cell is installed as part of a crane-safe load monitoring system. Four active atrain gauges are included in the load cell, cach with a nominal resistance of 120 and a gauge factor of 2 . The load cell consiss of a rectangular column of a cross-section sectional area of 2.25cm2. The column has Young's modulus of 21011N/m2 and Poisson's ratio of 0.26. a) Explain how the gauges should be arranged on the load cell ( 2 marks) b) Calculate the changes in gauge resistance valuen if a 12kN load is lifted by the crane. marks) c) Show how the four atrain gauges should be arranged within the bridge circuit (2 marks) d) What would be the bridge output voliage if the 12kN load is lifted by the crane? Assume the bridge supply of 24 volts. (4 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Chemical Engineering questions