Question
Henry's Kitchens makes two types of sandwich makers: Basic and Deluxe. The company expects to manufacture 70,000 units of Basic, which has a per-unit direct
Henry's Kitchens makes two types of sandwich makers: Basic and Deluxe. The company expects to manufacture 70,000 units of Basic, which has a per-unit direct material cost of $10 and a per-unit direct labor cost of $60. It also expects to manufacture 30,000 units of Deluxe, which has a per-unit material cost of $15 and a per-unit direct labor cost of $40. It is estimated that Basic will use 140,000 machine hours and Deluxe will require 60,000 machine hours. Historically, the company has used the traditional overhead allocation method and applied overhead at a rate of $21 per machine hour. It was determined that there were three cost pools, and the overhead for each cost pool is shown:
Machine setups $90 000
Machine processing $4 000 000
Material requisitions $100 000
Total overhead $ 4 190 000
The cost driver for each cost pool and its expected activity is shown:
Basic Deluxe Total
Machine setups 100 200 300
Machine hours 140 000 60 000 200 000
Parts requisitions 80 120 200
Required:
a) What is the per-unit cost for each product under the traditional overhead allocation method?
b) What is the per-unit cost for each product under ABC costing?
c) Briefly comment on the overhead applied per unit under the two overhead allocation methods. i.e. How much was overhead under or overapplied for each product? Further, would you recommend a change to ABC costing for Henry's Kitchens? Why or why not?
SHOW YOUR WORKING
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started