Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Hi Can you convert the reference to the Chicago Manual of the style 17th Edition? Ali, A. (2014). Standard terms of the construction contract for
Hi
Can you convert the reference to the Chicago Manual of the style 17th Edition?
- Ali, A. (2014). Standard terms of the construction contract for the renovation and small projects (STCC-RSP 2015). Tingkat: Construction Industry Development Board Malaysia. Retrieved from https://mro.massey.ac.nz/bitstream/handle/10179/11488/STCC-RSP%202015%20%26%20Proforma.pdf?sequence=1&isAllowed=y
- Ali, N. A. (2020). UNDERSTANDING PRINCIPLES OF CONSTRUCTION CONTRACTS USING A PLAIN LANGUAGE CONTRACT*. Construction Series. Retrieved from https://www.cidb.gov.my/sites/default/files/2020-05/Understanding-principles-of-construction-contracts-using-a-plain-language-contract-4-8-May-2020-2.pdf
- Bowen, G. (2009). Document Analysis as a Qualitative Research Method. Qualitative Research Journal, 9(2), 27-40.
- Bowmans. (2020). A Guide to Construction Contracts. Bowmans. Retrieved from https://www.bowmanslaw.com/wp-content/uploads/2016/12/Guide-Construction-Contracts.pdf
- (n.d.). Building (Residential construction contract Consumer Rights and Remedies) Regulations 2014. NZ Legislation. Retrieved from https://www.legislation.govt.nz/regulation/public/2014/0361/latest/versions.aspx
- (n.d.). Building Act 2004. NZ Legislation. Retrieved from https://www.legislation.govt.nz/act/public/2004/0072/latest/secondary.aspx?sds=aa&sdr=1&sda=1
- Caldern, D. S. (2017). Selection of contract type in construction contracts: Lump-Sum, Target-cost and Cost-plus. Blekinge Institute of Technology. Retrieved from https://www.diva-portal.org/smash/get/diva2:1118726/FULLTEXT02
- Chaphalkar, N. B., & Patil , S. (2012). Decision support system for dispute resolution in construction contracts. KSCE Journal of Civil Engineering, 499-504. Retrieved from https://link.springer.com/article/10.1007/s12205-012-1303-4
- CICC. (2007). Model Terms of Construction Contract between Contractor and Subcontractor for Subcontract Work. Construction Industry Development Board Malaysia.
- Cott, P. (2019). Time is of the essence. Building Connection, 48-49. Retrieved from https://search.informit.org/doi/abs/10.3316/informit.151640824915818
- Khalafalla, M., & Benavides, J. R. (2020). Methodology to Assess the Impact of Lump-Sum Compensation Provisions on Project Schedules. Journal of Management in Engineering, 36(4). Retrieved from http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000786
- Lakritz, L., A. E. Wasserman, R. Gates, and A. M. Spinelli. 'Preliminary Observations on Amines and Nitrosamines in Non-Normal Human Gastric Contents'.IARC Scientific Publications, no. 19 (1978): 425-31.
- Legal Information Institute. (2022, September 24). 26 U.S. Code 460 - Special rules for long-term contracts: residential construction contract construction contract. Retrieved from law.cornell.edu: https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=26-USC-1833450341-342553760&term_occur=999&term_src=
- Morgan, H. (2022). Conducting a Qualitative Document Analysis. The Qualitative Report, 27(1), 64-77. Retrieved from https://doi.org/10.46743/2160-3715/2022.5044
- NZ Standards Executive. (2004). NZS 3902:2004:Housing, alterations and small buildings contract. standards.govt.NZ. Retrieved from https://www.standards.govt.nz/shopzs-39022004
- Saad, I. (2020). Construction Contracts: From Zero-Sum to Win-Win. School of Advanced Structures, College of Engineering and Applied Science. Cincinnati: University of Cincinnati.
- Truong, D. V., & Ninh, D. T. (2017). Several legal issues on construction contract termination. Journal of Science and Technology in Civil Engineering, 11(6). Retrieved from https://stce.huce.edu.vn/index.php/en/article/view/960
- Ali, A. (2014). Standard terms of the construction contract for the renovation and small projects (STCC-RSP 2015). Tingkat: Construction Industry Development Board Malaysia. Retrieved from https://mro.massey.ac.nz/bitstream/handle/10179/11488/STCC-RSP%202015%20%26%20Proforma.pdf?sequence=1&isAllowed=y
- Ali, N. A. (2020). UNDERSTANDING PRINCIPLES OF CONSTRUCTION CONTRACTS USING A PLAIN LANGUAGE CONTRACT*. Construction Series. Retrieved from https://www.cidb.gov.my/sites/default/files/2020-05/Understanding-principles-of-construction-contracts-using-a-plain-language-contract-4-8-May-2020-2.pdf
- Bowen, G. (2009). Document Analysis as a Qualitative Research Method. Qualitative Research Journal, 9(2), 27-40.
- Bowmans. (2020). A Guide to Construction Contracts. Bowmans. Retrieved from https://www.bowmanslaw.com/wp-content/uploads/2016/12/Guide-Construction-Contracts.pdf
- (n.d.). Building (Residential construction contract Consumer Rights and Remedies) Regulations 2014. NZ Legislation. Retrieved from https://www.legislation.govt.nz/regulation/public/2014/0361/latest/versions.aspx
- (n.d.). Building Act 2004. NZ Legislation. Retrieved from https://www.legislation.govt.nz/act/public/2004/0072/latest/secondary.aspx?sds=aa&sdr=1&sda=1
- Caldern, D. S. (2017). Selection of contract type in construction contracts: Lump-Sum, Target-cost and Cost-plus. Blekinge Institute of Technology. Retrieved from https://www.diva-portal.org/smash/get/diva2:1118726/FULLTEXT02
- Chaphalkar, N. B., & Patil , S. (2012). Decision support system for dispute resolution in construction contracts. KSCE Journal of Civil Engineering, 499-504. Retrieved from https://link.springer.com/article/10.1007/s12205-012-1303-4
- CICC. (2007). Model Terms of Construction Contract between Contractor and Subcontractor for Subcontract Work. Construction Industry Development Board Malaysia.
- Cott, P. (2019). Time is of the essence. Building Connection, 48-49. Retrieved from https://search.informit.org/doi/abs/10.3316/informit.151640824915818
- Khalafalla, M., & Benavides, J. R. (2020). Methodology to Assess the Impact of Lump-Sum Compensation Provisions on Project Schedules. Journal of Management in Engineering, 36(4). Retrieved from http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000786
- Lakritz, L., A. E. Wasserman, R. Gates, and A. M. Spinelli. 'Preliminary Observations on Amines and Nitrosamines in Non-Normal Human Gastric Contents'.IARC Scientific Publications, no. 19 (1978): 425-31.
- Legal Information Institute. (2022, September 24). 26 U.S. Code 460 - Special rules for long-term contracts: residential construction contract construction contract. Retrieved from law.cornell.edu: https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=26-USC-1833450341-342553760&term_occur=999&term_src=
- Morgan, H. (2022). Conducting a Qualitative Document Analysis. The Qualitative Report, 27(1), 64-77. Retrieved from https://doi.org/10.46743/2160-3715/2022.5044
- NZ Standards Executive. (2004). NZS 3902:2004:Housing, alterations and small buildings contract. standards.govt.NZ. Retrieved from https://www.standards.govt.nz/shopzs-39022004
- Saad, I. (2020). Construction Contracts: From Zero-Sum to Win-Win. School of Advanced Structures, College of Engineering and Applied Science. Cincinnati: University of Cincinnati.
- Truong, D. V., & Ninh, D. T. (2017). Several legal issues on construction contract termination. Journal of Science and Technology in Civil Engineering, 11(6). Retrieved from https://stce.huce.edu.vn/index.php/en/article/view/960
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started