Hi I i need help with this long question parts A, B, and C 1-14??
Part A-Break-Even Analysis The management of Genuine Spice Inc. wishes to determine the number of cases required to break even per month. The utilities cost, which is part of factory overhead, is a mixed cost. The following information was gathered from the first six months of operation regarding this cost: Month Case Production Utility Total Cost January 500 $600 February BOO 660 March 1,200 740 April 1,100 720 May 950 690 June 1,025 705 Required-Part A: 1. Determine the fixed and variable portions of the utility cost using the high-low method. Round your per unit cost to two decimal places. 2. Determine the contribution margin per case. Round your answer to two decimal places. 3. Determine the fixed costs per month, including the utility fixed cost from part (1). Refer to the lists of Amount Descriptions for the exact wording of the answer choices for text entries. 4. Determine the break-even number of cases per month. Part B-August Budgets During July of the current year, the management of Genuine Spice Inc. asked the controller to prepare August manufacturing and income statement budgets. Demand was expected to be 1,500 cases at $100 per case for August. Inventory planning information is provided as follows: Finished Goods Inventory: Cases Cost Estimated finished goods inventory, August 1 300 $12,000 Desired finished goods inventory, August 31 175 7,000 Materials Inventory: Cream Base Oils Bottles (ozs.) (ozs.) (bottles) Estimated materials inventory, August 1 250 290 600 Desired materials inventory, August 31 1,000 360 240 There was negligible work in process inventory assumed for either the beginning or end of the month; thus, none was assumed. In addition, there was no change in the cost per unit or estimated units per case operating data from January. Required-Part B: 5. Prepare the August production budget. * 6. Prepare the August direct materials purchases budget.* 7. Prepare the August direct labor budget. Round the hours required for production to the nearest hour. 8. Prepare the August factory overhead budget. If an amount box does not require an entry, leave it blank. (Entries of zero (0) will be cleared automatically by CNOW.) 9. Prepare the August budgeted income statement, including selling expenses.* For those boxes in which you must enter subtractive or negative numbers use a minus sign. Part C-August Variance Analysis Check My Work Next Assignment Score: 0.0% All work saved. Email Instructor Save and Exit Submit Assignment for Grading + 3Instructions entry, leave it blank. (Entries of zero (0) will be cleared automatically by CNOW.) 9. Prepare the August budgeted income statement, including selling expenses.* "For those boxes in which you must enter subtractive or negative numbers use a minus sign. Part C-August Variance Analysis During September of the current year, the controller was asked to perform variance analyses for August. The January operating data provided the standard prices, rates, times, and quantities per case. There were 1,500 actual cases produced during August, which was 250 more cases than planned at the beginning of the month. Actual data for August were as follows: Actual Direct Materials Price per Unit Quantity per Case Cream base $0.016 per oz. 102 ozs. Natural oils $0.32 per oz. 31 ozs. Bottle (8-oz.) $0.42 per bottle 12.5 bottles Actual Direct Actual Direct Labor Labor Rate Time per Case Mixing $18.20 19.50 min. Filling 14.00 5.60 min. Actual variable overhead $305.00 Normal volume 1,600 cases The prices of the materials were different than standard due to fluctuations in market prices. The standard quantity of materials used per case was an ideal standard. The Mixing Department used a higher grade labor classification during the month, thus causing the actual labor rate to exceed standard. The Filling Department used a lower grade labor classification during the month, thus causing the actual labor rate to be less than standard. Required-Part C: 10. Determine and interpret the direct materials price and quantity variances for the three materials. Round your price values for Cream Base to three decimal places and Natural Oils & Bottles to two decimal places." 11. Determine and interpret the direct labor rate and time variances for the two departments. Do not round hours. Round your answers to two decimal places.* 12. Determine and interpret the factory overhead controllable variance.* 13. Determine and interpret the factory overhead volume variance. Round rate to four decimal places and round your final answer to two decimal places. 14. Why are the standard direct labor and direct materials costs in the calculations for parts (10) and (11) based on the actual 1,500-case production volume rather than the planned 1,375 cases of production used in the budgets for parts (6) and (7)? For those boxes in which you must enter subtractive or negative numbers use a minus sign. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Check My Work Next Assignment Score: 0.0% All work saved. Email Instructor Save and Exit Submit Assignment for Grading + 3Instructions Part B-August Budgets During July of the current year, the management of Genuine Spice Inc. asked the controller to prepare August manufacturing and income statement budgets. Demand was expected to be 1,500 cases at $100 per case for August. Inventory planning information is provided as follows: Finished Goods Inventory: Cases Cost Estimated finished goods inventory, August 1 300 $12,000 Desired finished goods inventory, August 31 175 7,000 Materials Inventory: Cream Base Oils Bottles (ozs.) (ozs.) (bottles) Estimated materials inventory, August 1 250 290 600 Desired materials inventory, August 31 1,000 360 240 There was negligible work in process inventory assumed for either the beginning or end of the month; thus, none was assumed. In addition, there was no change in the cost per unit or estimated units per case operating data from January. Required-Part B: 5. Prepare the August production budget. * 6. Prepare the August direct materials purchases budget.* 7. Prepare the August direct labor budget. Round the hours required for production to the nearest hour. 8. Prepare the August factory overhead budget. If an amount box does not require an entry, leave it blank. (Entries of zero (0) will be cleared automatically by CNOW.) 9. Prepare the August budgeted income statement, including selling expenses.' "For those boxes in which you must enter subtractive or negative numbers use a minus sign. Part C-August Variance Analysis During September of the current year, the controller was asked to perform variance analyses for August. The January operating data provided the standard prices, rates, times, and quantities per case. There were 1,500 actual cases produced during August, which was 250 more cases than planned at the beginning of the month. Actual data for August were as follows: Actual Direct Materials Price per Unit Quantity per Case Cream base $0.016 per oz. 102 ozs. Natural oils $0.32 per oz. 31 ozs. Bottle (8-oz.) $0.42 per bottle 12.5 bottles Actual Direct Actual Direct Labor Labor Rate Time per Case Mixing $18.20 19.50 min. Filling 14.00 5.60 min. Actual variable overhead $305.00 Normal volume 1,600 cases The prices of the materials were different than standard due to fluctuations in market prices. The standard quantity of materials used per case was an ideal standard. The Mixing Department used a higher grade labor classification during the month, thus causing the actual labor rate to exceed standard. The Filling Department used a lower grade labor classification during the month, thus causing the actual labor rate to be less than standard. Check My Work Next Assignment Score: 0.0% All work saved. Email Instructor Save and Exit Submit Assignment for Grading + 3