Hickory Company manufactures two products15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool | Activity Measure | Estimated Overhead Cost | Expected Activity | Machining | Machine Hours | $224,400 | 11,000 MHs | Machine Setups | # of Setups | $129,600 | 240 Setups | Production Design | # of Productions | $88,000 | 2 Products | General Factory | Direct Labor Hours | $254,000 | 13,200 DLHs | Activity Measure | Product Y | Product Z | Machine-Hours | 7,400 | 3,600 | # of Setups | 60 | 180 | # of Products | 1 | 1 | Direct Labor Hours | 8,400 | 4,800 | 11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) | | Product Y | Product Z | Manufacturing Overhead | % | % | 12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) | | Product Y | Product Z | Machining Cost | % | % | 13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) | | Product Y | Product Z | Machine Setups Cost | % | % | 15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places. Round your "Percentage" answers to 2 decimal places. (i.e. 0.1234 should be entered as 12.34).) | | Product Y | Product Z | General Factory Cost | % | % | |