Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Highland Company produces a lightweight backpack that is popular with college students Standard variable costs relating to a single backpack are given below: Direct materials

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

Highland Company produces a lightweight backpack that is popular with college students Standard variable costs relating to a single backpack are given below: Direct materials Direct labor Variable manufacturing overhead Standard Quantity or Hours ? 2 2 Standard Price or Rate $5.00 per yard Standard Cost $2 2 ? $2 per direct labor-hour Total standard cost $? Overhead is applied to production on the basis of direct labor-hours. During March, 790 backpacks were manufactured and sold. Selected information relating to the month's production is given below: Direct Labor $13,272 Variable Manufacturing Overhead $2,528 $3,421 Materials Used $15,800 $13,120 2 $ 600 U Total standard cost allowed Actual costs incurred Materials price variance Materials quantity variance Labor rate variance Labor efficiency variance Variable overhead rate variance Variable overhead efficiency variance 2 ? *For the month's production, The following additional information is available for March's production: Actual direct labor-hours Difference between standard and actual cost per backpack produced during March 1,400 $0,10 F Required: 1. What is the standard cost of a single backpack? Actual direct labor-hours Difference between standard and actual cost per backpack produced during March 1,400 $0.10 F Required: 1. What is the standard cost of a single backpack? Standard cost for March production Materials Direct labor Variable manufacturing overhead Total standard cost Number of backpacks produced Standard cost of a single backpack 2. What was the actual cost per backpack produced during March? (Round your answers to 2 decimal places.) Standard cost of a single backpack Deduct difference between standard and actual cost Actual cost per backpack 3. How many yards of material are required at standard per backpack? 5. What is the standard direct labor rate per hour? Standard variable manufacturing overhead cost for March Standard variable manufacturing overhead rate per direct labor- hour Standard direct labor-hours for March Standard direct labor cost for March Standard direct labor rate per hour 6. What was the labor rate variance for March? The labor efficiency variance? (Do not round your intermediate calculations. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance)) Labor rate variance Labor efficiency variance 7. What was the variable overhead rate variance for March? The variable overhead efficiency variance? (Do not round intermediate calculations. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance)) Variable overhead rate variance Variable overhead efficiency variance 8. Prepare a standard cost card for one backpack (Round your answers to 2 decimal places.) Standard Quantity or Hours Standard Price or Rate Standard Cost $ Direct materials yards 5.00 per yard Direct labor hours per hour $ 2.00 per direct labor-hour Variable manufacturing overhead hours Total standard cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management Control Systems Performance Measurement Evaluation And Incentives

Authors: Kenneth Merchant, Wim Van Der Stede

3rd Edition

0273737619, 978-0273737612

More Books

Students also viewed these Accounting questions