Question
hiL25664_ch05_164-223.indd Knickknack, Inc., prices its products at 120 percent of cost, which yields target prices of $796.80 for odds and $1,195.20 for ends. Recently, however,
hiL25664_ch05_164-223.indd
Knickknack, Inc., prices its products at 120 percent of cost, which yields target prices of $796.80 for odds and $1,195.20 for ends. Recently, however, Knickknack has been challenged in the market for ends by a European competitor, Bricabrac Corporation. A new entrant in this market, Bricabrac has been sell- ing ends for $880 each. Knickknack?s president is puzzled by Bricabrac?s ability to sell ends at such a low cost. She has asked you (the controller) to look into the matter. You have decided that Knickknack?s traditional, volume-based product-costing system may be causing cost distortion between the firm?s two products. Ends are a high-volume, relatively simple product. Odds, on the other hand, are quite complex and exhibit a much lower volume. As a result, you have begun work on an activity-based costing system.
Confirming Pages Chapter 5 Activity-Based Costing and Management Knickknack, Inc., manufactures two products: odds and ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Odds Ends Production quantity ............................................................................ Direct material ................................................................................... Direct labor (not including setup time) ................................................. Manufacturing overhead* ................................................................... 1,000 units $160 120 (4 hr. at $30) 384 (4 hr. at $96) 5,000 units $240 180 (6 hr. at $30) 576 (6 hr. at $96) Total cost per unit .............................................................................. $664 $996 *Calculation of predetermined overhead rate: Manufacturing overhead budget: Machine-related costs ....................................................................................................................... Setup and inspection ......................................................................................................................... Engineering ....................................................................................................................................... Plant-related costs ............................................................................................................................. $1,800,000 720,000 360,000 384,000 Total ................................................................................................................................................. $3,264,000 209 Problem 5-54 Activity-Based Costing; Activity Cost Pools; Pool Rates; Calculation of Product Costs; Cost Distortion (LO 5-1, 5-2, 5-3, 5-4, 5-5) 2. II. Setup and inspection: $9,000 per run 5. Odds, new target price: $2,420.64 Predetermined overhead rate: Budgeted manufacturing overhead Budgeted direect-labor hours $3, 264, 000 (1, 000)(4) (5, 0000)(6) $96 per direct-labor hour Knickknack, Inc., prices its products at 120 percent of cost, which yields target prices of $796.80 for odds and $1,195.20 for ends. Recently, however, Knickknack has been challenged in the market for ends by a European competitor, Bricabrac Corporation. A new entrant in this market, Bricabrac has been selling ends for $880 each. Knickknack's president is puzzled by Bricabrac's ability to sell ends at such a low cost. She has asked you (the controller) to look into the matter. You have decided that Knickknack's traditional, volume-based product-costing system may be causing cost distortion between the firm's two products. Ends are a high-volume, relatively simple product. Odds, on the other hand, are quite complex and exhibit a much lower volume. As a result, you have begun work on an activity-based costing system. Required: 1. Let each of the overhead categories in the budget represent an activity cost pool. Categorize each in terms of the type of activity (e.g., unit-level activity). 2. The following cost drivers have been identified for the four activity cost pools. Activity Cost Pool Machine-related costs Setup and inspection Engineering Plant-related costs Cost Driver Budgeted Level of Cost Driver Machine hours Number of production runs Engineering change orders Square footage of space 18,000 hr. 80 runs 200 change orders 3,840 sq. ft. You have gathered the following additional information: Each odd requires 8 machine hours, whereas each end requires 2 machine hours. Odds are manufactured in production runs of 25 units each. Ends are manufactured in 125 unit batches. Three-quarters of the engineering activity, as measured in terms of change orders, is related to odds. The plant has 3,840 square feet of space, 80 percent of which is used in the production of odds. For each activity cost pool, compute a pool rate. 3. Determine the unit cost, for each activity cost pool, for odds and ends. 4. Compute the new product cost per unit for odds and ends, using the ABC system. 5. Using the same pricing policy as in the past, compute prices for odds and ends. Use the product costs determined by the ABC system. 6. Show that the ABC system fully assigns the total budgeted manufacturing overhead costs of $3,264,000. 7. Show how Knickknack's traditional, volume-based costing system distorted its product costs. (Use Exhibit 5-10 for guidance.) hiL25664_ch05_164-223.indd 209 7/4/13 1:23 AM
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started