Holiday Laboratories purchased a high-speed industrial centrifuge at a cost of $330,000. Shipping costs totaled $16,000. Foundation work to house the centrifuge cost $7,500. An
Holiday Laboratories purchased a high-speed industrial centrifuge at a cost of $330,000. Shipping costs totaled $16,000. Foundation work to house the centrifuge cost $7,500. An additional water line had to be run to the equipment at a cost of $2,800. Labor and testing costs totaled $5,400. Materials used up in testing cost $2,200. The capitalized cost is: |
Multiple Choice
-
$356,300.
-
$363,300.
-
$363,900.
-
$346,000.