Home office overhead costs include items that cannot be readily charged to any one project. True False 5 points QUESTION 2 Job overhead costs comprise
- Home office overhead costs include items that cannot be readily charged to any one project.
True
False
5 points
QUESTION 2
- Job overhead costs comprise all costs that can be readily charged to a specific project and a specific item of work on that project.
True
False
5 points
QUESTION 3
- Sanitary facilities must be provided on worksites, but drinking water is generally each worker's responsibility.
True
False
5 points
QUESTION 4
- As a minimum, a bar chart schedule should be developed to estimate a reasonable project duration.
True
False
5 points
QUESTION 5
- Once the project duration has been determined, it needs be converted into calender days, often but not always 5 day workweeks.
True
False
5 points
QUESTION 6
- Undistributed labor includes job superintendent, engineers, watchmen, among others
True
False
5 points
QUESTION 7
- Productivity rates are often expressed as a number of work hours per unit of work.
True
False
5 points
QUESTION 8
- In general, the most reliable productivity rates come from software.
True
False
5 points
QUESTION 9
- Less trained craft workers require more time or work hours to complete required tasks.
True
False
5 points
QUESTION 10
- Many contractors refuse to bid on projects just before the expiration of union contracts, unless the terms of the contract provide for adjustments of the contract for potential wage increases.
True
False
5 points
QUESTION 11
- The cost of operating construction equipment, including operators wages and mobilization, should be calculated on the basis of the working hour.
True
False
5 points
QUESTION 12
- Interest rates should be charged against the entire cost of equipment, unless the contractor paid part of the cost in cash.
True
False
5 points
QUESTION 13
- Once exavation begins, earth and rock begin to swell, andshrinkage takes place.
True
False
5 points
QUESTION 14
- Cutting soil consists ofmaking theground level and contoured by removing trees and other obstacles.
True
False
5 points
QUESTION 15
- The perimeter of a building is the distance around the building.
True
False
5 points
QUESTION 16
- Backfilling is the putting back of excess soil that was removed from around a building during the general excavation.
True
False
5 points
QUESTION 17
- Finish grade is topsoil placed over the rough grade, often required in specifications.
True
False
5 points
QUESTION 18
- The term 'precast concrete' is applied to individual concrete members that are cast in separate forms and then placed in the structure.
True
False
5 points
QUESTION 19
- Generally, the higher the structure and the further the point of use from the point of delivery, the more the cost of transporting.
True
False
5 points
QUESTION 20
- Hydration refers to concrete curing.
True
False
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started