Homework: Comprehensive Problem complete HW Score: 12.5%, 1 of 8 pts Question Help 4 2 of Score: 0 of 1 pt CP19-46 (similar to) Using a job order costing system. Pithe Computer Companyamed the total cost of w o the over the estimates under conting) the computer Company is now considering using ABC system Wormation about ABC costs and records for the same to jobs for 2020 follow m e n to view the ABC formation) n to view the records for two T h e Read the require ABC) The cost of direct laboris 54 hour Requirement 1. Compute the total cost for each i ng activity based on Activity based costing Requirements Job 721 1. Computer ora n g ay based on the cost of direct laboris 14 per hour groter or less than that computed under anden for aw Computer Company wa samanering income to 50% the whats c h arge each of these customers Print Done think Check Answer Choose from any list or enter a number Check Answer 4. 1 Reference 7, Pithe Computer c estimates under job ww considering using or 2020 follow Standard costing (single plantwide rato): Job 721 Job 722 total cost for each job $ 2,000 Direct materials Direct labor 22,400 $ 18,000 2,700 43,100 $ 2,880 432 Manufacturing overhead" Total cost 5,312 * Direct labor calculated as follows: = Hours per job 750 120 Job 721 Job 722 X x x Direct labor cost per hour $ $ 24 Total direct labor costs per job 18,000 2.880 = $ ** Manufacturing overhead calculated as follows: X = Total direct labor costs per job 18,000 2,880 Predetermined OH allocation rate 15% 15% Manufacturing OH allocated 2.700 432 $ Job 721 Job 722 $ $ $ ter any number in their Print Done Check ost for each job using ac 0 Data Table Job 721 Activity Assembly Programming Allocation Base Number of parts Number of direct labor hours Number of tests Predetermined Overhead Allocation Rate 0.80 3.00 100.00 Testing Print Done y number in the input fields and then click Check Answer. the total cost for each job * Data Table Job Job 721 Job 722 Total Direct Materials Costs $ 22,400 2,000 Total Number of Parts 2,200 Total Number of Tests Total Direct Labor Hours 750 24 150 120 Print Done