Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

how to find the overhead cost on this project? Use the project response Word document posted in doc sharing and begin to respond to all

how to find the overhead cost on this project?
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
image text in transcribed
Use the project response Word document posted in doc sharing and begin to respond to all questions Be sure and address each question/request in detail providing emphasis on project objectives All graphs/charts/tables are to be produced in the native format (excel, project, etc.) and then copied into the response area of the Management Word document (picture ok) Major Submission Requirement: Post BOTH the Management Word document with all responses/graphs/charts/tables in the D21 upload area. In either Word or PDF format. It is your responsibilities to ensure the document is readable and complete. Software Project Team (YOU): TAMUC Software Consultants Customer: Lear Jet Avionics Division RFP awarded for specific message services which will be incorporated into an electronic instrument company (Lear Jet Avionics ) interface to electronic gauges. Topical level requirements for the software were provided. Deliverable products include: Systems Engineering to provide appropriate requirements decomposition Software Engineering to provide design/development/unit test of software System Test Engineering to provide component and enterprise level testing Quality Engineering to provide quality control through the entire development life cycle Management functions to include all primary functions (project management, Quality Engineering to provide quality control through the entire development life cycle - Management functions to include all primary functions (project management, finance, planning & scheduling, Overhead support (contracts, engineering matrix, etc.) Award date of May 15 and required completion date (deliverables provided) of November 15. Lear Jet Avionics request of planned deliverables, acceptance criteria, quality plan, and work breakdown structure. These items need to be provided in an acceptable time for Lear Jet to review and approve. Lear Jet Avionics further requests other deliverables to include final software (source and binary) which meets all approved acceptance criteria, associated design documents (system and development level) All project questions or request for project scope changes should be directed to the Lear Jet Avionics designee (course instructor). Lear Jet Avionics further requests other deliverables to include final software (source and binary) which meets all approved acceptance criteria, associated design documents (system and development level) All project questions or request for project scope changes should be directed to the Lear Jet Avionics designee (course instructor). There is no requirement relative to project tools used to generate the required data. Topical requirements include: - System Engineering: UML design artifacts for graphic widgets to display aeronautical expanse gauges for interface testing within the technical specs guidelines for twenty- five different visual aspects. Include appropriate level of peer review. Design should include graphical mock-up of gauges. 1 - System Engineering: Derive component level requirements for Software Engineering to design, code, and unit test and System Test can provide System and Enterprise level testing - Software Engineering: Provide appropriate level design artifacts from System Engineering UML design artifacts. Include appropriate level of peer review. - Software Engineering: Code and Unit Test software modules that execute the software which meets all topical and derived requirements - System Test Engineering: Derive sell-off acceptance criteria. Include appropriate peer review (including System Engineering) and customer approval. System Test Engineering: Derive System and Enterprise Level Test Cases. Include appropriate level of peer review. System Test Engineering: Execute test cases as software modules become available . - Quality Engineering: Provide quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriate - Include the following customer related reviews: Design Review (after System Engineering completes design artifacts), Pre-Ship Review (provided prior to Lear Jet Avionics acceptance of software), and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) Include appropriate level of peer review. - System Test Engineering: Execute test cases as software modules become available - Quality Engineering: Provide quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriate - Include the following customer related reviews: Design Review (after System Engineering completes design artifacts), Pre-Ship Review (provided prior to Lear Jet Avionics acceptance of software), and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) 1 Approved labor rates ($/hr.) as follows: System Engineer I: 43.15 - System Engineer II: 44.37 System Engineer III: 52.17 - Lead System Engineer: 56.93 - Software Engineer 1: 42.38 - Software Engineer II: 48.61 - Software Engineer III: 55.01 - Lead Software Engineer: 60.76 System Test Engineer l: 44.76 System Test Engineer II: 43.62 System Test Engineer III: 48.25 . . . . I Lead Software Engineer: 60.76 System Test Engineer I: 44.76 System Test Engineer II: 43.62 System Test Engineer III: 48.25 - Lead System Test Engineer: 63.21 - Quality Engineer l: 43.38 - Quality Engineer II: 47.54 - Quality Engineer III: 55.11 - Lead Quality Engineer: 60.89 - Project Manager: 96.52 (LOE - Level of Effort) - Chief Engineer: 76.41 (LOE - Level of Effort) Approved overhead rates as follows: Finance: 6.5% of total hours - Planning & Scheduling: 5.2% of total hours Management (Contracts/Senior Management): 2.3% of total hours - Facility: 1.7% of total hours - HR/Staffing: 0.61% of total hours ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG 2.1 Systems Engineering: UML Design for Interface System Engineering: Create outline of UML and derived requirements artifacts. Software Engineering: Assist system engineering. Quality Engineering: Provide quality checks 2.2 Systems Engineering: System/Software Design System Engineering: Design appropriate software components to display aeronautical expanse gauges within the technical specs guidelines for twenty-five different visual aspects. Include appropriate level of peer review. Soft Use the project response Word document posted in doc sharing and begin to respond to all questions Be sure and address each question/request in detail providing emphasis on project objectives All graphs/charts/tables are to be produced in the native format (excel, project, etc.) and then copied into the response area of the Management Word document (picture ok) Major Submission Requirement: Post BOTH the Management Word document with all responses/graphs/charts/tables in the D21 upload area. In either Word or PDF format. It is your responsibilities to ensure the document is readable and complete. Software Project Team (YOU): TAMUC Software Consultants Customer: Lear Jet Avionics Division RFP awarded for specific message services which will be incorporated into an electronic instrument company (Lear Jet Avionics ) interface to electronic gauges. Topical level requirements for the software were provided. Deliverable products include: Systems Engineering to provide appropriate requirements decomposition Software Engineering to provide design/development/unit test of software System Test Engineering to provide component and enterprise level testing Quality Engineering to provide quality control through the entire development life cycle Management functions to include all primary functions (project management, Quality Engineering to provide quality control through the entire development life cycle - Management functions to include all primary functions (project management, finance, planning & scheduling, Overhead support (contracts, engineering matrix, etc.) Award date of May 15 and required completion date (deliverables provided) of November 15. Lear Jet Avionics request of planned deliverables, acceptance criteria, quality plan, and work breakdown structure. These items need to be provided in an acceptable time for Lear Jet to review and approve. Lear Jet Avionics further requests other deliverables to include final software (source and binary) which meets all approved acceptance criteria, associated design documents (system and development level) All project questions or request for project scope changes should be directed to the Lear Jet Avionics designee (course instructor). Lear Jet Avionics further requests other deliverables to include final software (source and binary) which meets all approved acceptance criteria, associated design documents (system and development level) All project questions or request for project scope changes should be directed to the Lear Jet Avionics designee (course instructor). There is no requirement relative to project tools used to generate the required data. Topical requirements include: - System Engineering: UML design artifacts for graphic widgets to display aeronautical expanse gauges for interface testing within the technical specs guidelines for twenty- five different visual aspects. Include appropriate level of peer review. Design should include graphical mock-up of gauges. 1 - System Engineering: Derive component level requirements for Software Engineering to design, code, and unit test and System Test can provide System and Enterprise level testing - Software Engineering: Provide appropriate level design artifacts from System Engineering UML design artifacts. Include appropriate level of peer review. - Software Engineering: Code and Unit Test software modules that execute the software which meets all topical and derived requirements - System Test Engineering: Derive sell-off acceptance criteria. Include appropriate peer review (including System Engineering) and customer approval. System Test Engineering: Derive System and Enterprise Level Test Cases. Include appropriate level of peer review. System Test Engineering: Execute test cases as software modules become available . - Quality Engineering: Provide quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriate - Include the following customer related reviews: Design Review (after System Engineering completes design artifacts), Pre-Ship Review (provided prior to Lear Jet Avionics acceptance of software), and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) Include appropriate level of peer review. - System Test Engineering: Execute test cases as software modules become available - Quality Engineering: Provide quality checks during the processes described for System Engineering, Software Engineering, and System Test Engineering as appropriate - Include the following customer related reviews: Design Review (after System Engineering completes design artifacts), Pre-Ship Review (provided prior to Lear Jet Avionics acceptance of software), and Final Acceptance Test (software demonstration at customer facility showing software meets all requirements as installed) 1 Approved labor rates ($/hr.) as follows: System Engineer I: 43.15 - System Engineer II: 44.37 System Engineer III: 52.17 - Lead System Engineer: 56.93 - Software Engineer 1: 42.38 - Software Engineer II: 48.61 - Software Engineer III: 55.01 - Lead Software Engineer: 60.76 System Test Engineer l: 44.76 System Test Engineer II: 43.62 System Test Engineer III: 48.25 . . . . I Lead Software Engineer: 60.76 System Test Engineer I: 44.76 System Test Engineer II: 43.62 System Test Engineer III: 48.25 - Lead System Test Engineer: 63.21 - Quality Engineer l: 43.38 - Quality Engineer II: 47.54 - Quality Engineer III: 55.11 - Lead Quality Engineer: 60.89 - Project Manager: 96.52 (LOE - Level of Effort) - Chief Engineer: 76.41 (LOE - Level of Effort) Approved overhead rates as follows: Finance: 6.5% of total hours - Planning & Scheduling: 5.2% of total hours Management (Contracts/Senior Management): 2.3% of total hours - Facility: 1.7% of total hours - HR/Staffing: 0.61% of total hours ACTIVITY / TASK LIST BY LOWEST WBS LEVEL LEG 2.1 Systems Engineering: UML Design for Interface System Engineering: Create outline of UML and derived requirements artifacts. Software Engineering: Assist system engineering. Quality Engineering: Provide quality checks 2.2 Systems Engineering: System/Software Design System Engineering: Design appropriate software components to display aeronautical expanse gauges within the technical specs guidelines for twenty-five different visual aspects. Include appropriate level of peer review. Soft

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting

Authors: J. David Spiceland, James Sepe, Mark Nelson

6th edition

978-0077328894, 71313974, 9780077395810, 77328892, 9780071313971, 77395816, 978-0077400163

Students also viewed these Accounting questions