Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Huskie Mills produces three different types of fabric using two departments. The first department is Weaving and the second department is Dyeing. The unit of

Huskie Mills produces three different types of fabric using two departments. The first department is Weaving and the second department is Dyeing. The unit of measure for fabric is a bolt. Bolts contain 20 years of fabric each. All fabric is inspected during production. Robotic equipment inspects the fabric for obvious flaws as the bolts are wound up. Each bolt spends about five minutes in the inspection process. The Dyeing department goes through a set-up process each time the color is changed.

Previously, Huskie used a process costing system that assigned Direct Material costs to each product separately, but allocated Direct Labor and Overhead costs as if they were incurred equally across the bolts produced. Huskie Mills typically has no beginning or ending inventory in any given month. During the month in question, no spoilage was recorded.

Required: Develop an Excel workbook with one or more worksheets to perform the following calculations. Use a Data Input section and maximize the use of cell referencing. Use traditional process costing to assign the Direct Materials and Conversion costs to the bolts of the three different types of fabric. Develop a Cost per Bolt for each type of fabric which illustrates the amount of Direct Material and Conversion in each bolt. Specifically illustrate the Conversion Cost per Bolt, the Total Cost assigned to each type of fabric and the Cost of Bolt of each type of fabric.

Denim Light Weight Cotton Heavy Weight Cotton Total
Direct Cost
Direct Materials
Dept 1 $6,000 $16,000 $15,000 $37,000
Dept 2 $2,000 $8,000 $5,000 $15,000
Direct Labor
Dept 1 $840 $2,400 $1,200 $4,440
Dept2 $480 $1,440 $640 $2,560
Overhead Cost
Machine $40,000
Setup $12,000
Inspection $25,000
Total Overhead $77,000
Volumes
Units(bolts) 2000 8000 4000 14000
Direct Labor hours 33 96 46 175
Macine Hours 500 2000 1500 4000
Number of set-ups 10 30 20 60
Inspection Hours 180 80 240 500

please explain or show work on how you got answers

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Internal Auditing Assurance And Advisory Services

Authors: Kurt R. Reding, Paul J. Sobel, Urton L. Anderson, Michael J. Head, Sridhar Ramamoorti, Mark Salamasick, Cris Riddle

3rd Edition

0894137409, 978-0894137402

More Books

Students also viewed these Accounting questions

Question

Name some of potential business applications of virtual reality.

Answered: 1 week ago

Question

25.0 m C B A 52.0 m 65.0 m

Answered: 1 week ago

Question

Recognize the features of practical performance appraisal forms

Answered: 1 week ago