Question
1 Approved Answer
The hydroelectric plant has a catchment area of 120 square km. The available runoff is 50% with an annual rainfall of 100 cm. Ahead of
The hydroelectric plant has a catchment area of 120 square km. The available runoff is 50% with an annual rainfall of 100 cm. Ahead of 250 m is available on an average. The efficiency of the power plant is 70%. Find (i) average power produced (ii) capacity of the power plant. Assume a load factor of 0.6.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
The hydroelectric plant has a catchment area of 120 sq...