Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Hysteresis Controller Assignment #9 Electrical Engineering Project - MATLAB (Simulink) RMS House 1 voltmeter node 10 Feeder Impedance of lenght 100m Applaince 3.5KW water heater
Hysteresis Controller Assignment #9 Electrical Engineering Project - MATLAB (Simulink) RMS House 1 voltmeter node 10 Feeder Impedance of lenght 100m Applaince 3.5KW water heater node 10 Air Conditioner Fridge node 10 node 10 node 10 node 10 Right now, it works like this: If demand is normal (healthy) Controller will return 1 If the demand is high (Not healthy) Controller will return 0 Assignment #9 If demand is high (Not healthy) turn off appliances - based on priority set by user- to make the demand healthy For example, if demand is high (not healthy) turn off the air conditioner first Then if demand stay high (not healthy) Turn off fridge next Hysteresis Controller Assignment #9 Electrical Engineering Project - MATLAB (Simulink) RMS House 1 voltmeter node 10 Feeder Impedance of lenght 100m Applaince 3.5KW water heater node 10 Air Conditioner Fridge node 10 node 10 node 10 node 10 Right now, it works like this: If demand is normal (healthy) Controller will return 1 If the demand is high (Not healthy) Controller will return 0 Assignment #9 If demand is high (Not healthy) turn off appliances - based on priority set by user- to make the demand healthy For example, if demand is high (not healthy) turn off the air conditioner first Then if demand stay high (not healthy) Turn off fridge next
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started