Question
I am having a tough time with this one, any help would be appreciated! Knicknack Knickknack, Inc. manufactures two products: odds and ends. The firm
I am having a tough time with this one, any help would be appreciated!
Knicknack
Knickknack, Inc. manufactures two products: odds and ends. The firm uses a single, plant wide OH rate based
on DL hours. Production and product-costing data are as follows:
OddsEnds
Production Quantity1,0005,000
DM$160$240
DL (not including set-up time)120 (4 hr @ $30)180 (6 hr @ $30)
MOH384 (4 hr @ $96)576 (6 h @ $96)
Total cost per unit$664$996
MOH budget
Machine-related costs$1,800,000
Setup and Inspection720,000
Engineering360,000
Plant-related Costs384,000
Total$3,264,000
(predetermined rate$3,264,000/ (1,000*4)+(5,000*6)=$96 per hour)
Knickknack, Inc. prices its products at 120% of cost, which yields target prices of $796.80 for odds and $1,195.20
for ends. Recently, however, Knicknack has been challenged in the market for ends by a European competitor, Bricabrac Corporation. A new entrant in this market, Bricabrac has been selling ends for $880 each. Knickknack's president is puzzled by Bricabrac's ability to sell ends at such a low cost.
She has asked you to look into the matter. You have decided that Knicknack's traditional volume-based
product-costing system may be causing the cost distortion between the firm's two products. Ends are a high-
volume, relatively simple product. Odds, on the other hand, are quite complex and exhibit a much lower
volume. You will try ABC.
1. Let each of the OH categories in the budget represent an activity cost pool
2. The following cost drivers have been identified for the four activity cost pools
Act Cost PoolCost DriverBudgeted Level
Machine-related costsMachine hours18,000 hr.
Setup and Inspection# of production runs80 runs
EngineeringEng. change orders200 change orders
Plant-related costsSquare footage3,840 sq. ft.
You have gathered the following information:
1. Each odd requires 8 machine hours, whereas each end requires 2 machine hours
2. Odds are manufactured in production runs of 25 units each. Ends are in 125 unit batches
3. 3/4 of the engineering activity as measured by change orders are related to odds.
4. The plant has 3,840 sq. ft. of space, 80% of which is used in the production of odds.
A. Determine the unit cost, for each activity pool, for odds and ends
B. Compute the new product cost per unit for odds and ends using ABC.
C. Show how the price was distorted under the traditional system.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started