Question

00
1 Approved Answer

(I) Complete the network analysis for the maintenance facility project based on the expected durations for each activity which can be determined (following the PERT

(I) Complete the network analysis for the maintenance facility project based on the expected durations for each activity which can be determined (following the PERT approach )from the task data in Appendix 2. This initial analysis should be completed on the basis of the normal working practices. (ii) Produce a Linked Barchart that presents a summary of the 'normal' project program. (iii) To the nearest whole day calculate the target duration for the construction of the maintenance facility allowing for a 95% probability of on time completion. This is the duration that will agreed with the Client for project handover. If the project is delivered later than this agreed target duration, penalty costs of 12,500 per day will be incurred by the project team. (iv) When the PLE was prepared for this project, it was assumed that the construction company contracted to construct the maintenance facility would be able to use both of the cranes that it owns to complete the necessary tasks. The following tasks each require the use of a crane: 'Construct Columns L/H side', 'Construct Columns R/H side', Install Roof Trussel', 'Attach Roof Cladding Panels' and 'Attach Wall Cladding Panels'. However, since the initial planning the contractor has advertised that one of their two cranes has suffered a failure of a critical safety component. The repair has been scheduled but unfortunately due to a supply chain issue affecting the required replacement component, the repair will not be completed in time for the tasks the crane was needed for in this project. Consequently, the contractor will now only be able to supply their 1 remaining usable crane for all of these tasks as opposed to the 2 that were originally planned for. In keeping with the conditions in their contract, the contractor has notified you in advance and as a result the contractor themselves will not be held liable for any penalty costs or additional indirect costs incurred but they will ensure there is no increase in the direct costs accrued by the affected tasks. Re-plan the project so that no more than 1 crane will be required for the completion of these 5 tasks and report the implications to the project caused by dealing with this unexpected resource constraint. (v) Having re-planned the project for this resource constraint, the project is now underway. The following tasks have already been completed: 'Clear Site', 'Install Ground Drainage', Excavate and Construct Raft and Floor Slab', Construct Columns L/H side', Construct Columns R/H side and 'Install Roof Trusses'. However, unfortunately during the execution of the 'Construct Columns L/H side' and 'Construct Columns R/H side' there were problems with high winds that interfered with the safe working of the crane and ultimately this delayed the completion of these two tasks. The 'Construct Columns L/H side' task took 2 days longer to complete than was originally scheduled and the 'Construct Columns R/H side' task took 1 additional day to complete compared to the original schedule. The direct costs for each of these tasks will not increase as a consequence of these delays because the contractor has decided to absorb the additional direct costs in a goodwill gesture acknowledging the problems they caused earlier by only supplying one crane. However, the project is now further delayed and further penalty costs (which are not included within the direct costs the contractor will absorb) will now be incurred. As a Project Manager,it is your responsibility to try to make sure the remainder of the project is completed as optimally as it can. This requires you to re-plan the remainder of the project, accelerating the delivery of tasks that can be crashed by using overtime and thereby minimising the remaining cost of completing the project including any penalty costs. Using the crash sat in Appendix 2, re-- plan the remaining tasks in project, so that the most optimum solution for the delivery of the project in the light of the problems experienced will now be achieved. When 'crashing' the remaining tasks to determine the optimum solution, you must assume that it is 'all or nothing' scenario; in other words, incremental ' crashing' of tasks is not permissible .

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions

Question

Explain the steps involved in training programmes.

Answered: 1 week ago

Question

What are the need and importance of training ?

Answered: 1 week ago