I consider the manufacture of toy A . The master production Schedule, product structure , BOM and inventory records are given as followers: - week
I consider the manufacture of toy A . The master production Schedule, product structure , BOM and inventory records are given as followers: - week 1 2 3 4 5 6 7 8 Demand / 200 100 175 - 300/200 250 Icce) Bl Quantity Units Lead Stock time A 350 EC2) 1 200 DC3) B 450 2 400 C 400 2 1 375 D 375 3 1 250 425 E E 400 1 Complete the material requirement plan table for the main product A as well as for the subassembly B