Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

I don't need a hand written answer please. Hlable 300) F PR 9-3A Direct materials, direct labor, and factory overhead Obj. 3, 4 cost variance

image text in transcribed

I don't need a hand written answer please.

Hlable 300) F PR 9-3A Direct materials, direct labor, and factory overhead Obj. 3, 4 cost variance analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 40,000 units of product were as follows: Actual Costs TE Direct materials Direct labor Factory overhead 118,500 lbs. at $3.25 per lb. 11,700 hrs. at $25.00 per hr. Standard Costs 120,000 lbs. at $3.20 per lb. 12,000 hrs. at $24.40 per hr. Rates per direct labor hr., based on 100% of normal capacity of 15,000 direct labor hrs.: Variable cost, $8.00 Fixed cost, $10.00 $91,200 variable cost $150,000 fixed cost Each unit requires 0.3 hour of direct labor. Instructions Determine (a) the direct materials price variance, direct materials quantity variance, and total direct materials cost variance; (b) the direct labor rate variance, direct labor time variance, and total direct labor cost variance; and (c) the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions

Question

Draw a labelled diagram of the Dicot stem.

Answered: 1 week ago