Question
1 Approved Answer
(i) For the transport infrastructure project details shown below, draw the AON network diagram and determine the following for all activities: (a) early start, (b)
(i) For the transport infrastructure project details shown below, draw the AON network diagram and determine the following for all activities: (a) early start, (b) early finish, (c) late start, (d) late finish, and (e) total float. Assume Finish to Start (FS) precedence relationships. Deterministic Immediate Late Critical/ Activity Duration Predecessor(s) Lag Early Early Late Total Finis Non- (days) Start Finish Start float (days) h critical Z 10 B 5 Z 15 D. B 20 3 E 10 B, C F 15 D, E G 20 H 10 C,F.G 6 L 25 D, F M 15 J 2 AND (ii) Assuming a practical project-based setting in the above-mentioned transport infrastructure project, you are required to provide your report for managing stakeholders using CLIP analysis, Venn diagram, and stakeholder register
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started