I hatian I BAMBO 4 We there are morsomme 16,990,00 entered into the needs. Dentrond terms and we www. What is the per Cerror www terem 10.8.0 eerdered as 10.8. Meie vahel ended by a perdite etter und per weer www.Auto.am PA WACC way which the Your division is considering two projects with the following cash flows (in Millions): 0 1 3 -$19 -$17 $8 $11 $15 $8 Project A $17 Project B $6 a. What are the projects NPVs assuming the WACC is 5%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round Intermediate calculations. Round your answer to two decimal places. Project A: $ million Project B: $ million What are the projects' NPVs assuming the WACC is 10%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places Project A: $ million Project B: $ million What are the projects NPVs assuming the WACC IS 15%? Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to two decimal places. Project A million Project B: million b. What are the projects' IRRS assuming the WACC IS 5W? Do not round intermediate calculations, Round your answer to two decimal places, Project A Project B: % % % % b. What are the projects' IRRs assuming the WACC is 5%? Do not round intermediate calculations. Round your answer to two decimal places. Project A: Project B: What are the projects' IRRs assuming the WACC is 10%? Do not round intermediate calculations. Round your answer to two decimal places. Project A: Project B: What are the projects' IRRs assuming the WACC is 15%? Do not round intermediate calculations. Round your answer to two decimal places. Project A: Project B: c. If the WACC was 5% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 89.04%.) -Select If the WACC was 10% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 89.04%.) - Select If the WACC was 15% and A and B were mutually exclusive, which project would you choose? (Hint: The crossover rate is 89.04%.) % % Select