Answered step by step
Verified Expert Solution
Question
1 Approved Answer
i have a few things wrong with my spreadsheet using solver. this is the message i received from my professor can you please help. attached
i have a few things wrong with my spreadsheet using solver. this is the message i received from my professor can you please help. attached is the question and spreadsheet.
Professor: none of the problems using Solver arecomplete. I see 2-30 is blank..except for the entered values from problem's given.
problems 2-34 & 2-40 have completed problems. But, Solver is blank.
\f2-30 A warehouse storage building company must deter- mine how many storage sheds of each sizelarge or smallto build in its new 8,000-square-foot facility to maximize rental income. Each large shed is 150 square feet in size, requires $1 per week in advertis- ing, and rents for $50 per week. Each small shed is 50 square feet in size, requires $1 per week in advertising, and rents for $20 per week. The company has a weekly advertising budget of $100 and estimates that it can rent no more than 40 large sheds in any given week. 2-34 A plumbing manufacturer makes two lines of bath- tubs, model A and model B. Every tub requires blending a certain amount of steel and zinc; the company has available a total of 24,500 pounds of steel and 6,000 pounds of zinc. Each model A bath- tub requires a mixture of 120 pounds of steel and 20 pounds of zinc, and each yields a profit of $90. Each model B tub produced can be sold for a profit of $70; it requires 100 pounds of steel and 30 pounds of zinc. To maintain an adequate supply of both models, the manufacturer would like the number of model A tubs made to be no more than 5 times the number of model B tubs. Find the best product mix of bathtubs 2-40 A photocopy machine company produces three types of laser printersthe Print Jet, the Print Desk, and the Print Pro the sale of which earn profits of $60, $90, and $73, respectively. The Print Jet requires 2.9 hours of assembly time and 1.4 hours of testing time. The Print Desk requires 3.7 hours of assem- bly time and 2.1 hours of testing time. The Print Pro requires 3 hours of assembly time and 1.7 hours of testing time. The company wants to ensure that Print Desk constitutes at least 15% of the total production and Print Jet and Print Desk together constitute at least 40% of the total production. There are 3,600 hours of assembly time and 2,000 hours of testing time available for the month. What combination of printers should be produced to maximize profitsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started