Question
********I need a handwritten flowchart******* A manufacturing system is comprised of two machines (a drilling machine and a laser cutting machine) working in series to
********I need a handwritten flowchart*******
A manufacturing system is comprised of two machines (a drilling machine and a laser cutting machine) working in series to process two-part types (A and B). Assume that Part As arrive to the drilling machine according to a Uniform (2,6) minutes distribution and that Part Bs arrive to the drilling machine according to a Triangular (0.5,3,5) minutes distribution. Parts are drilled according to a first in first out (FIFO) queuing discipline.
The drilling machine requires a fixed 3 minutes to process each part, regardless of type.
All parts go immediately to the cutting process after exiting the drilling machine.
There are two laser-cutting machines.
Parts wait for the next available laser-cutting machine and are cut according to a last in first out (LIFO) queuing discipline. The processing time distribution at each laser-cutting machine is Exponential (5) minutes, regardless of part type.
one replication for eight hours of simulated time.
********I need a handwritten flowchart*******
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started