Question
I need an understanding and explanation of the following: 1. Include a completed copy of the WDM in your paper (you can copy and paste
I need an understanding and explanation of the following:
1. Include a completed copy of the WDM in your paper (you can copy and paste the format from the table below).
2. Discuss your logic for the ratings you provided.
3. Which project should your team approve? Why?
4. Indicate why you did not decide to pursue the other two projects.
Project 1
An intense thrill ride, which gives the rider the experience of escaping from an avalanche. Users will be securely restrained in a standing position on 'skis', with shoulder harnesses. For safety, riders must be at least 53 inches tall. The ride will be on a track, (like a roller coaster). The ride must be inside, which means a new building must be constructed. Air-conditioned fans and light mist will reproduce the feeling of a bitter-cold winter day. A combination of screens, projections, and light effects will show the avalanche coming down all around the rider. At one point the ride will go dark and it will appear that the snow has consumed the rider before they burst out into the bright sunlight and arrive safely at the foot of the mountain.
Probability: 80% 50% 20%
Profit (ROI): 11% 15% 18%
Project 2
A riverboat ride that gives the rider the experience of drifting down a river in the jungle. Boats can carry up to 8 individuals and will be on a track for safety. Each rider will have a restraint device. Riders must be at least 36 inches tall to fit safely within the seat. During multiple sections of the ride, there will be rapids that rush the boat downstream, generating moderate splashes. There will be one large drop where photos will be taken, which will be available for sale at the end of the ride. Animatronics will be used for a variety of animals that move. At one point on the ride a python snake will drop down from a limb and hiss a few feet from the boat before retracting and there are animatronic crocodiles near the riverbanks. This ride can be outside but will require a large amount of landscaping and scenery to give the rider the feeling of being immersed in the jungle.
Probability: 80% 50% 20%
Profit (ROI): 18% 20% 23%
Project 3
This is another roller coaster style ride. Riders will be secured into seats within carts that look like dragons. Each dragon will be covered in detailed scales in bold, metallic colors. Each dragon can hold up to twelve riders, seated side by side. The ride will give the participant the feeling of flying the dragon through the skies, over forest, meadow, and fiery landscapes, and through a kingdom. Different fantastical creatures will be in the scenery, including unicorns, fairies, griffins, and so on. Animatronics within the kingdom will include the king, a princess, knights, citizens, and farm animals. The ride will have three points throughout that will take photos that will be available for purchase at the end of the ride.
Probability: 80% 50% 20%
Profit (ROI): 20% 22% 26%
Weighted Decision Matrix
Organizational Requirements | Score Criteria | Proposed Project 1 | Proposed Project 2 | Proposed Project 3 | |
Meets all safety and environmental standards | Indicate Yes or No | ||||
Appropriate for ages 9-13 | Indicate Yes or No | ||||
Morally sound and inclusive | Indicate Yes or No | ||||
Other Project Criteria | Weight (0-100) | Score Criteria | Weighted Score | Weighted Score | Weighted Score |
Generate profit greater than 15% | 70 | 0 = 20% | |||
1 = 50% | 70 | ||||
2 = 80% | 140 | 140 | |||
Generate additional merchandise sales | 50 | 0 = no potential | |||
1 = low potential | |||||
2 = high potential | |||||
Attract multiple visits per rider/participant | 60 | 0 = no potential | |||
1 = low potential | |||||
2 = high potential | |||||
Accommodate small groups | 30 | 0 = no potential | |||
1 = low potential | |||||
2 = high potential | |||||
Would be described as a 'must-do' by riders/participants | 25 | 0 = no potential | |||
1 = low potential | |||||
2 = high potential | |||||
Total Weighted Score | |||||
Priority |
To complete the weighted score, multiply the weight by the score and input that number into the box. You can do whole numbers or percentages, whichever you prefer,as long as you are consistent. For example, if the project will generate greater than 20% profit, you can enter 140 or 1.4 in the weighted score. Just be consistent throughout the entire matrix.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started