i need help on the bid price is based on expected costs. Case on Job-Order Costing and Pricing Decisions Nutrotask, Inc; is a pharmaceutical manufacturer

i need help on the bid price is based on expected costs. image text in transcribed
image text in transcribed
image text in transcribed
Case on Job-Order Costing and Pricing Decisions Nutrotask, Inc; is a pharmaceutical manufacturer of amino-acid-cheiated minerais and vitamin supplements. The company was founded in 1974 and is capable of performing all manufacturing functions, including packaging and laboratory functions. Currently, the company markets its products in the United States, Canoda, Australis, Japan, and Belgium. Mineral chelation enhances the mineral's availability to the body, making the mineral a more effective supplement. Most of the chelates supplied by Nutratask are in powder form, but the company has the capability to make tablets or capsules. The production of ail chelates follows a similar pattem. Upon receiving an order, the company's chemist prepares a load sheet (a.bill of materials that specifies the product, the theoretical yield, and the quanties of materials that should be used). Once the load sheet is received by production, the materials are requistiorted and sen to the biending room. The chemicals and minerals are added in the order specified and blended together for two to eight hours, depending on the product. After blending. the mix is put on long troys and sent to the drying room, where it is allowed to dry untif the moisture content is 7 to 9 percent. Drying time for most products is from one to three days. Aner the product is dry, several small samples are taken and sent to a laboratory to be checked for bacterlal level and to determine whether the product meets customer specifications. If the product is not fit for human consumption or if it falls to meot customer specifications; additional materials are added under the directioa of the chemist to bring the product up to standard. Once the product passes inspectioc, it is ground into a powder of different meshes (particle sizes) according to customer specincations: The powder is then placed in heary cardboard drums and shipped to the customer (or, if requested, put in tablet or capsule form and then shipped). Since each order is customized to meet the special needs of its customers, Nutratask uses a job-order costing system, Recently, Nuaratask recelved a request for a 300 kilogram order of potassium aspartate. The customer offered to pay $8.80/kg. Upon recelving the request and the customer's specifications, Lanny Smith, the marketing manager, requested a load sheet from the companv's chemist. The load sheet prepared showed the following material requirements: The theoretical vield is 300kg. Lanny also reviewed past jobs that were similar to the requested order and discovered that the expected direct labor time was 16 hours. The production workers at Nutratask earn an average of $12.50 per hour: Purchasing sent Lantry a list of prices for the materials needed for the yob. Overhead is applied using a comparywide rate based on direct labor dollars. The rate for the current period is 110 percent of direct labor doltan. Whenever a customer requests a bid, Nutratask usually estimates the manufacturing costs of the job and then adds a markup of 30 percent. This markup yaries depending on the competition and general economic conditions. Currently, the industry is thriving, and Nutratask is operating at capacity. Required: 1. Prepare a job-arder cost sheet for the proposed job. If required, round your answers to the nearest cent, If an answer box does not require an entry, leave it blanke. For the following: When required, round your answers to the nearest cent. What is the expected per-unit cost including the markup (the price charged)? per unit Should Nutratask accept the price offered by the prospective customer? 2. Suppose Nutratak and the prospective customer agree on a price of cost plus 30 percent. What is the gross profit that Nutratask expects to earn on the job? 3. Suppose that the actual costs of producing 300kg of potassium aspartate were as follows: Round your intermediate and final answers to the nearest cent. What is thet actual perunit cosk? per unit The bid price is based on expected costa. How much did Nutratask gain (or lose) because of the actual costs differing from the expected costs

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

International Accounting

Authors: Frederick D. S. Choi, Gary K. Meek

7th Edition

0136111475, 9780136111474

More Books

Students also viewed these Accounting questions

Question

1. Letters and diaries in history.

Answered: 1 week ago